The first coal-based power plant of Arab Gulf country is being developed in Saih Shuaib, Dubai, United Arab Emirates. The 2,400MW Hassyan clean coal power station will be built at an estimated cost of $ 3.4 billion.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
The project will comprise four units of 600MW each, which are expected to start operations in 2020, 2021, 2022 and 2023 respectively. The power plant is expected to produce sufficient electricity to power approximately 250,000 households.
Dr Colleen Begg from South Africa has won the 2026 Prince William Award for Conservation…
Professor Shekhar C. Mande, President of the Indian National Science Academy (INSA), has been appointed…
The winners of the National Gopal Ratna Awards (NGRA) 2026 have been announced. It aims…
Four cheetah cubs have been born to a female cheetah in the wild, increasing the…
India has developed its very own H5N1 subtype Bird Flu Vaccine for Chickens. On November…
On 20 th November 2026, the Prime Minister Narendra Modi formally opened the First Shanghai…