The first coal-based power plant of Arab Gulf country is being developed in Saih Shuaib, Dubai, United Arab Emirates. The 2,400MW Hassyan clean coal power station will be built at an estimated cost of $ 3.4 billion.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
The project will comprise four units of 600MW each, which are expected to start operations in 2020, 2021, 2022 and 2023 respectively. The power plant is expected to produce sufficient electricity to power approximately 250,000 households.
From premium watches and jewellery to eyewear and smart wearables, Titan has become India's one…
National News FSSAI Regulates Healthy and Organic Food Claims on Packaged Foods The Food Safety…
India and France have strengthened the innovation-driven cooperation by launching the India-France ATL Bridge which…
The 16th BRICS Agriculture Ministers Meeting concluded in Indore, Madhya Pradesh and unanimously adopted the…
United Kingdom Prime Minister Keir Starmer has announced the landmark proposal to ban social media…
India's ambitious Mumbai-Ahmedabad Bullet Train Project has achieved the engineering milestone with the deployment of…