Cabinet Approves Patna-Arrah-Sasaram Corridor & Kosi-Mechi Intra-State Link Project

To boost connectivity and agricultural irrigation in Bihar, the Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi has approved two key infrastructure projects—the Patna-Arrah-Sasaram Corridor and the Kosi-Mechi Intra-State Link Project. These projects aim to support regional development, generate employment, and align with the government’s vision of “Atmanirbhar Bharat.”

Key Highlights

Patna-Arrah-Sasaram Corridor (NH-119A)

  • Type: 4-lane access-controlled corridor (Hybrid Annuity Mode – HAM).
  • Length: 120.10 km.
  • Cost: ₹3,712.40 crore.

Purpose

  • Decongest existing state highways.
  • Reduce travel time from 3–4 hours.

Connectivity Benefits

  • Links Patna to Sasaram and Arrah.
  • Connects with major transport nodes including the upcoming Bihita Airport and railway stations.
  • Enhances linkage between cities like Patna, Varanasi, Ranchi, and Lucknow.
  • Employment Generation: Around 48 lakh man-days.
  • Socio-economic Impact: Boosts regional growth and logistics efficiency.

Kosi-Mechi Intra-State Link Project

  • Inclusion: Under PMKSY-AIBP (Pradhan Mantri Krishi Sinchai Yojana – Accelerated Irrigation Benefits Programme).
  • Estimated Cost: ₹6,282.32 crore.
  • Central Assistance: ₹3,652.56 crore.
  • Completion Target: March 2029.

Objective

  • Divert surplus water from the Kosi River to irrigate the Mahananda basin.
  • Remodel the Eastern Kosi Main Canal (EKMC).

Irrigation Impact

  • Additional irrigation potential for 2.10 lakh hectares.
  • Covers Araria, Purnea, Kishanganj, and Katihar districts.
  • Benefits Kharif crop irrigation.
  • Agricultural Growth: Ensures water access for current and new farmlands.
Summary/Static Details
Why in the news? Cabinet Approves Patna-Arrah-Sasaram Corridor & Kosi-Mechi Intra-State Link Project
Patna-Arrah-Sasaram Corridor – 120.10 km, 4-lane
– ₹3,712.40 crore
– HAM model
– Reduces travel time, decongests state highways
– Links Patna, Sasaram, Bihita Airport, major cities
– Employment: 48 lakh man-days
Kosi-Mechi Intra-State Link Project – ₹6,282.32 crore total cost
– ₹3,652.56 crore central support
– Completion by March 2029
– Irrigates 2.10 lakh hectares in 4 districts
– Part of PMKSY-AIBP
– Remodels EKMC, benefits Kharif season irrigation
Shivam

As a Content Executive Writer at Adda247, I am dedicated to helping students stay ahead in their competitive exam preparation by providing clear, engaging, and insightful coverage of both major and minor current affairs. With a keen focus on trends and developments that can be crucial for exams, researches and presents daily news in a way that equips aspirants with the knowledge and confidence they need to excel. Through well-crafted content, Its my duty to ensures that learners remain informed, prepared, and ready to tackle any current affairs-related questions in their exams.

Recent Posts

FSSAI Launches Official Vegan Logo to Improve Consumer Awareness and Transparency

The Food Safety and Standards Authority of India (FSSAI) has introduced the standardized vegan logo…

16 hours ago

J&K Bank Wins Gold at Finacle Innovation Awards 2026 for AI-Powered Analytics Platform

The Jammu & Kashmir Bank (J&K Bank) won the Gold Award at the Finacle Innovation…

16 hours ago

UN General Assembly Elects 5 New Non-Permanent Members to Security Council for 2027–2028

The United Nations General Assembly (UNGA) has selected the five new countries to serve as…

17 hours ago

India and UK Launch Critical Minerals Global Supply Chain Observatory

India and the United Kingdom have jointly launched the India-UK Critical Minerals Global Supply Chain…

17 hours ago

Neelkanth Mishra Appointed India’s Next Executive Director at the World Bank

The Government of India has named Neelkanth Mishra as the India's next Executive Director at…

18 hours ago

University of Liverpool to Establish First Indian Campus in Bengaluru

The University of Liverpool which is one of the United Kingdom's leading universities has received…

18 hours ago