Cabinet gave approval for CHANDRAYAAN-4 Mission

The Union Cabinet chaired by Prime Minister Narendra Modi approved a new moon mission ‘Chandrayaan-4’, to develop and demonstrate the technologies to come back to Earth after successfully landing on the Moon and also collect moon samples and analyze them on Earth.

About Mission

  • Chandrayaan-4 mission will achieve the foundational technologies capabilities eventually for an Indian landing on the moon (planned by year 2040) and return safely back to Earth.
  • Major technologies that are required for docking/undocking, landing, safe return to earth and also accomplish lunar sample collection and analysis would be demonstrated.

Vision

The Government of India has outlined an expanded vision for the Indian space programme during the Amrit Kaal that envisages an Indian Space Station (Bharatiya Antriksh Station) by 2035 and Indian Landing on the Moon by 2040. 

Progress till date

  • A series of Gaganyaan & Chandrayaan follow-on missions are envisaged including the development of associated space transportation & infrastructure capabilities.
  • The successful demonstration of safe and soft landing of Chandrayaan-3 Lander on the Lunar Surface has established vital technologies and demonstrated capabilities that only few other nations possess.
  • A natural successor to the successful landing mission is the demonstration of the ability to collect Lunar Samples and return them safely back to Earth.

ISRO’s Role

  • ISRO (Indian Space Research Organisation) will be responsible for the development of spacecraft and launch.
  • The Project will be effectively managed and monitored through the established practices prevailing at ISRO.
  • The mission is expected to be completed within 36 months of approval with the participation of industry and academia.
  • All the critical technologies are envisaged to be indigenously developed. The realization of the mission is through various industries and it is envisaged that there would be high employment potential and technology spin-off to other sectors of the economy.

Fund

  • The total fund requirement for the technology demonstration mission “Chandrayaan-4” is Rs. 2104.06 Crore.
  • The cost includes spacecraft development and realization, two launch vehicle missions of LVM3, external deep space network support and conducting special tests for design validation, finally leading to the mission of landing on the moon surface and safe return to Earth along with the collected lunar sample.

Expectations

  • The mission would enable India to be self-sufficient in critical foundational technologies for manned missions, lunar sample return and scientific analysis of Lunar samples.
  • Towards realization there would be a significant involvement of Indian Industry.
  • Plan for associating the Indian academia through Chandrayaan-4 science meets, workshops, is already in place.
  • This mission will also ensure the establishment of facilities for curation and analysis of the returned samples, which will be national assets.

Shivam

As a Content Executive Writer at Adda247, I am dedicated to helping students stay ahead in their competitive exam preparation by providing clear, engaging, and insightful coverage of both major and minor current affairs. With a keen focus on trends and developments that can be crucial for exams, researches and presents daily news in a way that equips aspirants with the knowledge and confidence they need to excel. Through well-crafted content, Its my duty to ensures that learners remain informed, prepared, and ready to tackle any current affairs-related questions in their exams.

Recent Posts

Messi Creates History! First Footballer Ever to Win Princess of Asturias Sports Award

Lionel Messi become the first individual football player to receive the prestigious 2026 Princess of…

2 hours ago

NASA Shuts Down MAVEN Spacecraft After 10 Years at Mars – Here’s Why

After more than a decade of the pioneering scientific discoveries around the Mars, NASA has…

2 hours ago

India’s First Model Border Village is Here, Why Chumur is Making Headlines?

India has launched its first Model Border Village project at Chumur in Ladakh. It is…

3 hours ago

Bangladesh’s Khalilur Rahman Elected President of UN General Assembly’s 81st Session

Bangladesh’s Foreign Minister and veteran diplomat Khalilur Rahman has been elected as the President of…

3 hours ago

Microsoft Unveils Fairwater AI Data Centre to Promote Sustainable AI Infrastructure

In the current times where the Artificial Intelligence continues to transform the industries globally the…

4 hours ago

Chandigarh University Becomes First Private University to Launch IndiaAI Data Lab with Intel

The Chandigarh University (CU) has become the first private university in India to establish the…

4 hours ago