CM Mohan Yadav Launches ‘Lokpath Mobile App’ For Public

Bhopal, Chief Minister Dr. Mohan Yadav has said that our aim is to make all departments as accountable as possible towards the public. Lokpath Mobile App prepared by the Public Works Department is being launched with a view to continuously moving forward on the path of public welfare by adopting a more transparent and accountable working system towards the public.

About the app

Chief Minister Dr. Yadav said that quick improvement will be possible with the app as per the need in 40 thousand kilometer long roads of the state.

  • It is a challenging and courageous task for the department to make improvements in 7 days. It is believed that the department will be successful in successfully implementing this innovation using the latest technology.
  • Although it is natural for roads to get damaged due to excessive rainfall, waterlogging and heavy vehicle traffic, the department should try to ensure that there are no potholes on the roads.
  • Lokpath Mobile App is an important step for the empowerment of Road Information and Management System.

Facilities for this app

The mobile app will provide the facility to the general public to report the problems of the roads and will also ensure the accountability of the officers. Lokpath Mobile App has been prepared by Madhya Pradesh State Electronic Development Corporation Limited.

  • Lokpath Mobile App can be downloaded and installed by visiting the website of Public Works Department www.mppwd.gov.in.
  • By opening the app in the mobile phone and taking a photo of the pot hole / patch of the registered roads and uploading it in the app, the complaint will reach the concerned officer directly for resolution.
  • The officer will repair this pot hole / patch within a time limit of seven days and register the resolution through the app, the information of which will be received by the complainant on the mobile.

Implementation of this scheme

All the repairable national highways, state highways, main district and other district and rural roads of the state under the Public Works Department will be included. This scheme will be implemented in two phases. The first phase is being started from July 2. It will include national highways, state highways and main district roads. In the second phase, the remaining other district and rural roads will be included along with the roads included in the first phase.

 

trilok

Recent Posts

Weekly Current Affairs One Liners (1st to 7th June, 2026)

Weekly Current Affairs One-Liners Current Affairs 2026 plays a very important role in competitive examinations…

16 hours ago

UIDAI CEO Saurabh Vijay Takes Charge as CEO of IndiaAI Mission

Saurabh Vijay CEO of the Unique Identification Authority of India (UIDAI) has assumed the charge…

1 day ago

India Launches E85 Fuel: 85% Ethanol Blend to Reduce Oil Imports and Emissions

For the energy security and sustainable transportation India set to launch the E85 fuel, it…

1 day ago

Uttar Pradesh Sangeet Natak Akademi Honors 51 Artistes at SNA Samman Ceremony 2026

The Uttar Pradesh Sangeet Natak Akademi (SNA) had honored the 51 distinguished artistes at the…

1 day ago

India’s Forex Reserves Rise to $682.32 Billion Despite Decline in Gold Holdings

Foreign exchange reserves of India has a fresh increase during the week was ended on…

1 day ago

RBI Deputy Governor Swaminathan Janakiraman Gets Two-Year Extension Until 2028

Swaminathan Janakiraman reappointed as the Deputy Governor of the Reserve Bank of India (RBI) for…

1 day ago