India’s nuclear power capacity is expected to reach 22,480 Mega Watts by 2031 from the current 6,780 MegaWatts. There are presently 22 reactors with a total capacity of 6780 MW in operation and one reactor, KAPP-3 (700 MW) has been connected to the grid on January 10, 2021.
Buy Prime Test Series for all Banking, SSC, Insurance & other exams
Ten (10) nuclear power reactors with 8000 MW capacity (including 500 MW PFBR being implemented by Bharatiya Nabhikiya Vidyut Nigam Limited {BHAVINI}) are under construction. Additionally, the Government has accorded administrative approval and financial sanction of ten (10) indigenous Pressurized Heavy Water Reactors (PHWRs) of 700 MW each to be set up in fleet mode.
Dr Colleen Begg from South Africa has won the 2026 Prince William Award for Conservation…
Professor Shekhar C. Mande, President of the Indian National Science Academy (INSA), has been appointed…
The winners of the National Gopal Ratna Awards (NGRA) 2026 have been announced. It aims…
Four cheetah cubs have been born to a female cheetah in the wild, increasing the…
India has developed its very own H5N1 subtype Bird Flu Vaccine for Chickens. On November…
On 20 th November 2026, the Prime Minister Narendra Modi formally opened the First Shanghai…