In Karnataka, Chief Minister, BS Yediyurappa laid the foundation stone for a 11.5 megawatt power plant based on municipal waste in Bidadi, Bengaluru. It is first of its kind power plant in the state being set up by the Karnataka Power Corporation Limited (KPCL) and will help in converting 600 tonnes of municipal waste into 11.5-megawatt energy.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
This power plant will add 80.59 million units of power to the existing power grid. The power plant project is being constructed at a cost of Rs. 260 crore and is likely to be operational by 2022.
Important takeaways for all competitive exams:
The "Stairway to Heaven" is one of the most amazing natural places in the world.…
The Goods and Services Tax (GST) collections of the country has reached the all-time high…
To boost the global health democracy the Aarogya Maitri portable healthcare infrastructure in the Jamaica.…
The Infosys has appointed the Nitin Paranjpe as the its Non-Executive Vice Chairman with the…
Amul is one of the most trusted and loved food brands in India. From butter…
The State Government of Karnataka has introduced the India's first digital grievance redressal system for…