ONGC Secures Bid To Purchase PTC’s Wind Power Division For Rs 925 crore

 

In a strategic move to expand its renewable energy portfolio and reduce its reliance on fossil fuels, the state-owned Oil and Natural Gas Corporation (ONGC) has successfully secured a bid to acquire PTC India Ltd’s wind power unit for Rs 925 crore. This acquisition marks ONGC’s continued effort to diversify its business interests beyond its core hydrocarbon operations.

PTC Board’s Approval and Pending Shareholder Consent

Recently, the board of PTC approved ONGC’s bid to acquire a 100% equity stake in PEL, valuing the equity at Rs 925 crore. However, this acquisition is still subject to the approval of PTC shareholders, which will determine its finalization.

Insight into PTC Energy Limited (PEL)

PEL was incorporated on August 1, 2008, and boasts a renewable energy portfolio with a total capacity of 288.8 MW. This portfolio includes 50 MW wind power projects in Madhya Pradesh, 50 MW wind power projects in Karnataka, and 188.8 MW wind power projects in Andhra Pradesh. PEL has secured long-term agreements with state distribution companies for its entire 288.8 MW wind power project portfolio. In the fiscal year 2022-23 (from April 2022 to March 2023), PEL reported a profit of Rs 13.88 crore with a revenue of Rs 296.77 crore.

ONGC’s Commitment to Renewable Energy and Carbon Neutrality

ONGC has previously declared its ambitious goal to achieve zero carbon emissions by 2038. To realize this objective, the company has pledged to invest Rs 2 lakh crore, with Rs 1 lakh crore allocated for establishing 10 gigawatts of renewable energy capacity, a green ammonia plant, and offshore wind energy projects by 2030. The remaining investments will follow suit to meet Scope 1 and 2 net zero carbon emission targets, all while continuing its exploration and production of oil and gas.

Understanding Scope 1 and Scope 2 Emissions

Scope 1 emissions are emissions originating directly from sources owned or controlled by a company, while Scope 2 emissions result from the consumption of purchased electricity, steam, or other forms of energy generated upstream from a company’s immediate operations.

ONGC’s Progress in Renewable Energy

ONGC currently has a 189 MW renewable energy generation capacity and aims to escalate this to 10 gigawatts by 2030. The company has already signed a Memorandum of Understanding (MoU) for 5 GW of capacity in Rajasthan and is actively seeking similar-sized projects. Additionally, ONGC plans to establish 25 compressed biogas plants that will convert agricultural residue into gas suitable for running automobiles (CNG) and generating electricity and fertilizer in various industries.

Production Projections

In the fiscal year 2022-23, ONGC produced 19.584 million tonnes (MT) of oil, an increase from the previous year’s 19.545 MT. It is anticipated that oil output will rise to 20.232 MT in the current fiscal year (April 2023 to March 2024) and further increase to 21.265 MT in 2024-25. In terms of natural gas, production is expected to grow from 20.636 billion cubic meters (bcm) in 2022-23 to 20.882 bcm in 2023-24, 22.171 bcm in the following year, and 23.708 bcm in 2025-26.

Find More Business News Here

 

 

saurabh

Recent Posts

Kerala Gets First Private Medical Museum in Thiruvananthapuram

The state of Kerala got the first private medical museum, which is established in Ulloor,…

10 hours ago

Indian Railways Launches CHIRAG Centre in Hyderabad to Modernise HR Governance with AI

Indian railways has launched the CHIRAG Centre in Hyderabad. It is a dedicated national hub…

10 hours ago

Sports Ministry Notifies Rules for National Sports Board and Tribunal Under Governance Reform Act

India's Sports Ministry has notified the operational rules for the National Sports Board (NSB) and…

11 hours ago

IIP Reform Explained: New Base Year, Chain-Linked Methodology, and What It Means for India

Ministry of Statistics and Policy Implementation (MoSPI) has proposed the major overhaul of the Index…

11 hours ago

Assam Introduces UCC Bill 2026 in Assembly, Proposing Major Personal Law Reforms

The Assam state government has tabled the Uniform Civil Code (UCC) Bill, 2026 in the…

11 hours ago

RBI Tightens Urban Co-operative Bank Governance with New Director Tenure Limits

The Reserve Bank of India (RBI) has introduced stricter norms for the directors of Urban…

12 hours ago