PM Modi Laid Foundation Stone For ₹6,957 Crore Kaziranga Elevated Corridor

Prime Minister Narendra Modi on January 18, 2026, laid the foundation stone of the ₹6,957 crore Kaziranga Elevated Corridor in Assam and virtually flagged off two Amrit Bharat Express trains. The project is designed to protect wildlife movement, reduce road accidents, and strengthen connectivity while promoting tourism and employment in the region.

Why in News?

Prime Minister Modi inaugurated the Kaziranga Elevated Corridor project worth ₹6,957 crore. He also flagged off two new Amrit Bharat Express trains to improve long-distance rail connectivity.

About Kaziranga Elevated Corridor

  • The Kaziranga Elevated Corridor is a 34.5-km-long elevated road forming part of the widening of National Highway-715.
  • The highway runs along the southern boundary of Kaziranga National Park, separating it from the Karbi Anglong hills.
  • During floods, animals naturally migrate southwards to higher ground, but heavy traffic blocks their movement.
  • The elevated corridor will allow vehicles to pass above while animals cross safely underneath.
  • The project also includes bypasses around towns like Jakhalabandha and Bokakhat to reduce congestion.

Why the Existing Highway Is Dangerous for Wildlife

  • NH-715 is one of the biggest threats to wildlife in Kaziranga.
  • Daily traffic has increased steadily, with thousands of vehicles passing through animal corridors.
  • Research studies have recorded over 6,000 animal deaths in one year on this stretch, especially during the monsoon season.
  • High vehicle speed, night-time movement, and poor visibility make crossings deadly for animals such as deer, leopards, and rhinos.
  • Though animal sensors and speed regulations exist, they offer only temporary relief. Experts agree that infrastructure redesign is the only long-term solution.

How the Corridor Helps Conservation and Development

  • The elevated corridor represents a model where development and conservation work together.
  • By diverting heavy traffic onto elevated sections, the natural landscape below remains accessible to wildlife.
  • Forest officials believe this will significantly reduce roadkill and stress on animals. Conservationists have reminded that careful construction is essential to minimise disturbance.
  • Once completed, the corridor is expected to provide a permanent solution to wildlife deaths while also improving connectivity between Guwahati, eastern Assam, and Numaligarh, benefiting trade, tourism and local livelihoods.

About Kaziranga National Park

Aspect Details
State Assam
River Brahmaputra
Biodiversity Zone Eastern Himalayan Hotspot
National Park Status 1974
Tiger Reserve 2006
UNESCO Status World Heritage Site (1985)
Famous For One-Horned Rhinoceros
Key Rivers Diphlu
Major Fauna Rhino, Tiger, Elephant, Buffalo, Swamp Deer
Vegetation Wet alluvial grasslands, elephant grass
Major Threats Poaching, flooding

Key Summary at a Glance

Aspect Details
Why in News? Foundation stone of Kaziranga Corridor laid
Project Cost ₹6,957 crore
Corridor Length Nearly 34.45 km elevated stretch
Location NH-715, Assam
Key Objective Wildlife safety & connectivity

Question

Q1. The Kaziranga Elevated Corridor is mainly aimed at,

A. Increasing toll revenue
B. Ensuring safe wildlife movement
C. Expanding mining activities
D. Urban housing development

Shivam

As a Content Executive Writer at Adda247, I am dedicated to helping students stay ahead in their competitive exam preparation by providing clear, engaging, and insightful coverage of both major and minor current affairs. With a keen focus on trends and developments that can be crucial for exams, researches and presents daily news in a way that equips aspirants with the knowledge and confidence they need to excel. Through well-crafted content, Its my duty to ensures that learners remain informed, prepared, and ready to tackle any current affairs-related questions in their exams.

Recent Posts

West Bengal Name Change Proposal 2026: Paschim Banga, Assembly Date and Approval Process

The West Bengal Cabinet has approved a name change and announced that it will submit…

20 minutes ago

PANI Project: Centre Proposes Undersea Fibre Cable to Connect Eight Andaman and Nicobar Islands

Improvements to digital connectivity within the Andaman and Nicobar Islands are being considered through the…

4 hours ago

Asia Power Index 2026: India Retains Third Position, Overall Power Score Rises to 40.5

India ranks as one of Asia's three most powerful countries in the 2026 Asia Power…

5 hours ago

Global Peace Honours 2026: Divyaj Foundation Recognises Courage and Humanity

On 21st November at the Gateway of India, Mumbai, individuals from various areas of life…

5 hours ago

Pooja Pal Develops Low-Cost Dust-Free Threshing Machine, Wins INSPIRE Award

A 17-year-old girl from Uttar Pradesh named Pooja Pal has created an inexpensive dust reducing…

6 hours ago

Nayi Chetna 5.0 to Launch on November 25: Focus on Women’s Economic Empowerment

On 25th November 2026 (International Day for the Elimination of Violence against Women), the Ministry…

7 hours ago