The first coal-based power plant of Arab Gulf country is being developed in Saih Shuaib, Dubai, United Arab Emirates. The 2,400MW Hassyan clean coal power station will be built at an estimated cost of $ 3.4 billion.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
The project will comprise four units of 600MW each, which are expected to start operations in 2020, 2021, 2022 and 2023 respectively. The power plant is expected to produce sufficient electricity to power approximately 250,000 households.
Have you ever noticed that forests have their own protectors? Nature creates a balance where…
Ever wondered why winters in India feel cool but not extremely freezing? Nature has placed…
Did you know one of the world’s most famous literary awards started with a quiet…
The National Cooperative Development Corporation (NCDC) is implementing two major initiatives—Yuva Sahakar Scheme and Swayamshakti…
The PNB LUXURA Metal Credit Card is a premium credit card launched by Punjab National…
The Karnataka government has announced the rollout of an automatic property mutation system, a major…