The first coal-based power plant of Arab Gulf country is being developed in Saih Shuaib, Dubai, United Arab Emirates. The 2,400MW Hassyan clean coal power station will be built at an estimated cost of $ 3.4 billion.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
The project will comprise four units of 600MW each, which are expected to start operations in 2020, 2021, 2022 and 2023 respectively. The power plant is expected to produce sufficient electricity to power approximately 250,000 households.
Hours after the death of Iran’s Supreme Leader Ayatollah Ali Khamenei was confirmed the senior…
Iranian state media has confirmed that Supreme Leader Ayatollah Ali Khamenei, Iran’s most powerful political…
Did you know that calendars are not the same everywhere in the world? Different countries…
Jammu and Kashmir etched their name in history by winning the Ranji Trophy 2025-26 in…
Union Minister Sarbananda Sonowal inaugurated three key infrastructure projects on National Waterway-2 (NW-2) along the…
The Indian Air Force (IAF) displayed its combat power during Exercise Vayu Shakti 2026 at…