In Karnataka, Chief Minister, BS Yediyurappa laid the foundation stone for a 11.5 megawatt power plant based on municipal waste in Bidadi, Bengaluru. It is first of its kind power plant in the state being set up by the Karnataka Power Corporation Limited (KPCL) and will help in converting 600 tonnes of municipal waste into 11.5-megawatt energy.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
This power plant will add 80.59 million units of power to the existing power grid. The power plant project is being constructed at a cost of Rs. 260 crore and is likely to be operational by 2022.
Important takeaways for all competitive exams:
The Haryana State Assembly has unanimously passed a resolution to mark the 350th martyrdom year…
Every country has something special that makes it famous around the world. Some are known…
The United States and Jordan have carried out a major military operation in Syria called…
Jammu & Kashmir has achieved an important milestone in the modernization of public services with…
At the 2ndWHO Global Summit on Traditional Medicine held in New Delhi, Narendra Modi released…
Prime Minister Narendra Modi to inaugurate the new terminal building of Lokpriya Gopinath Bordoloi International…