In Karnataka, Chief Minister, BS Yediyurappa laid the foundation stone for a 11.5 megawatt power plant based on municipal waste in Bidadi, Bengaluru. It is first of its kind power plant in the state being set up by the Karnataka Power Corporation Limited (KPCL) and will help in converting 600 tonnes of municipal waste into 11.5-megawatt energy.
WARRIOR 4.0 | Banking Awareness Batch for SBI, RRB, RBI and IBPS Exams | Bilingual | Live Class
This power plant will add 80.59 million units of power to the existing power grid. The power plant project is being constructed at a cost of Rs. 260 crore and is likely to be operational by 2022.
Important takeaways for all competitive exams:
Goa is a small state on the western coast of India, famous for its beaches,…
Every year, people around the world search for words that show what interests them the…
The Hurun Rich List 2025 has once again highlighted India’s dynamic startup and business ecosystem.…
India’s innovation ecosystem has received global recognition as an Indian satellite internet concept emerged as…
India’s fiscal position showed resilience in the current financial year as net direct tax collections…
Recently, the Union Minister informed the Rajya Sabha about the progress and impact of the…