Maruti Suzuki Opens India’s Largest In-Plant Railway Siding at Manesar

In a major step towards sustainable logistics and greener transportation, Maruti Suzuki India Limited (MSIL) has inaugurated India’s largest in-plant automobile railway siding at its Manesar facility in Haryana. Developed with an investment of ₹452 crore, the project is aligned with the PM Gati Shakti National Master Plan and aims to significantly cut carbon emissions and fuel consumption by enhancing rail-based vehicle dispatch.

Why in News?

On June 17, 2025, Railway Minister Ashwini Vaishnaw and Haryana CM Nayab Singh Saini inaugurated the Manesar in-plant railway siding, India’s largest of its kind. The project is a part of Maruti Suzuki’s green logistics strategy to shift 35% of its dispatches to rail by FY2030-31. This is MSIL’s second in-plant railway siding, after Gujarat, showing its growing focus on rail-based automobile logistics.

Project Overview

  • Location: Maruti Suzuki’s Manesar Plant, Haryana.
  • Investment: ₹452 crore (₹325 crore in JV for corridor + ₹127 crore for yard).
  • Execution Agency: Haryana Orbital Rail Corporation Ltd (HORCL) – a JV partner.
  • Siding Area: Spread over 46 acres.
  • Rail Track Length: 8.2 km (4 full-length rake tracks + 1 engine escape track).
  • Capacity: To dispatch 4.5 lakh vehicles annually.

Sustainability & Environmental Impact

  • Estimated to reduce 1.75 lakh tonnes of CO₂e emissions per year.
  • Will save 60 million litres of fuel annually.
  • Aligned with India’s Net Zero Emissions target for 2070.
  • Supports PM Gati Shakti National Master Plan for integrated infrastructure.

Operational Highlights

  • Models from Manesar and Gurugram plants will be transported to 17 logistics hubs across 380 Indian cities.
  • Will serve port locations like Mundra and Pipavav for exports.
  • First automobile train flagged off from the Manesar siding during the event.

Background and Track Record

  • MSIL has dispatched 25 lakh vehicles by rail since FY2014–15.
  • Became the first Indian automaker to launch an in-plant railway siding at its Gujarat facility in March 2024.
  • The Haryana Orbital Rail Corridor (HORC), covering 126 km from Sonipat to Palwal, forms the backbone of this development.

Strategic Goals & Future Plans

  • Aim: 35% of vehicle dispatches via rail by FY30–31.
  • Focus: Green logistics, reduction in road congestion, cost-effective transportation, and climate resilience.
  • The initiative complements India’s broader push to promote multimodal transport networks.
Summary/Static Details
Why in the news? Maruti Suzuki Manesar In-Plant Railway Siding
Investment ₹452 crore
Developed by MSIL + Haryana Orbital Rail Corporation Ltd (HORCL)
Rail Corridor 126 km Haryana Orbital Rail Corridor (HORC)
Total Track Length 8.2 km
Annual Dispatch Capacity 4.5 lakh vehicles
Sustainability Impact Avoids 1.75 lakh tonnes of CO₂, saves 60 million litres of fuel annually
Future Dispatch Target 35% by FY2030–31 via rail

Shivam

Recent Posts

What was the Old Name of Goa? Know About It

Goa is a small state on the western coast of India, famous for its beaches,…

11 hours ago

Top-10 Most Searched Words in 2025, Check the List

Every year, people around the world search for words that show what interests them the…

12 hours ago

Deepinder Goyal Tops Hurun Rich List 2025 for India’s Self-Made Entrepreneurs

The Hurun Rich List 2025 has once again highlighted India’s dynamic startup and business ecosystem.…

13 hours ago

Indian Team Bags Global Top Honour at NASA Space Apps Challenge

India’s innovation ecosystem has received global recognition as an Indian satellite internet concept emerged as…

13 hours ago

India’s Net Direct Tax Collections Rise 8% to ₹17.05 Lakh Crore Till December 17

India’s fiscal position showed resilience in the current financial year as net direct tax collections…

13 hours ago

What is SabhaSaar Initiative? Features, Significance, and Latest Update

Recently, the Union Minister informed the Rajya Sabha about the progress and impact of the…

14 hours ago