ReNew Power to Build India’s Largest RE Complex in Andhra Pradesh

In a major push to India’s renewable energy ambitions, ReNew Power has announced the setting up of the country’s largest single-site Renewable Energy (RE) complex at Bethapalle village in Anantapur district, Andhra Pradesh. With a planned investment of ₹22,000 crore, the mega project will be inaugurated on May 16, 2025, and will be a milestone in strengthening India’s clean energy infrastructure.

Why in News?

ReNew Power’s investment marks a significant development in India’s renewable energy landscape, especially in Andhra Pradesh, where investor confidence has been rejuvenated under the new NDA-led government. This project also highlights the implementation of Andhra Pradesh’s Integrated Clean Energy Policy (ICEP), introduced in October 2024.

Key Project Details

  • Location: Bethapalle village, Anantapur district, Andhra Pradesh
  • Total Investment: ₹22,000 crore
  • Project Type: Single-site renewable energy complex
  • Inauguration Date: May 16, 2025
  • Attending Dignitary: Andhra Pradesh IT & HRD Minister Nara Lokesh

Phase-I Capacity and Components

  • Solar Power: 587 MW
  • Wind Power: 250 MW
  • Battery Energy Storage System (BESS): 415 MWh
  • Phase-I Cost: ₹7,000 crore

Planned Cumulative Capacity

  • Solar: 1,800 MW (peak)
  • Wind: 1 GW
  • BESS: 2,000 MWh

Significance & Objectives

  • Aligns with Andhra Pradesh’s 72 GW renewable energy target by 2029
  • Demonstrates revival of investor confidence post policy reforms
  • Reflects India’s broader push towards clean and sustainable energy
  • Aims to create jobs and support grid resilience through BESS

Background

  • ReNew Power was once the largest RE investor in AP (2019) with 777 MW.
  • Expansion paused after PPA cancellations by previous government.
  • Re-entry supported by NDA policies and Nara Lokesh’s engagement at WEF Davos 2024.

Other Recent Major RE Investments in Andhra Pradesh

  • Tata Power: ₹49,000 crore (7,000 MW)
  • NTPC: ₹1.86 lakh crore (green hydrogen)
  • Vedanta’s Serentica: ₹50,000 crore (10,000 MW)
  • Brookfield: ₹50,000 crore (8,000 MW)
  • SAEL: ₹6,000 crore (1,200 MW)
Summary/Static Details
Why in the news? ReNew Power to Build India’s Largest RE Complex in Andhra Pradesh
Project Name ReNew Power’s Single-Site Renewable Energy Complex
Location Bethapalle, Anantapur district, Andhra Pradesh
Total Investment ₹22,000 crore
Phase-I Capacity 587 MW solar, 250 MW wind, 415 MWh BESS
Phase-I Cost ₹7,000 crore
Total Planned Capacity 1,800 MW solar, 1 GW wind, 2,000 MWh BESS
Policy Support Integrated Clean Energy Policy (ICEP), Oct 2024
AP RE Target by 2029 72 GW

Shivam

Recent Posts

Simone Tata: The Visionary Behind Lakmé and Westside Passes Away at 95

Simone Tata, a transformative figure in India’s business landscape and the step-mother of Ratan Tata,…

38 mins ago

When was IndiGo Airlines Founded and Who Founded It?

IndiGo Airlines is one of India’s most popular and trusted airlines. It is known for…

1 hour ago

Which Country is Known as Deutschland?

Many countries have different names in different languages. One such country is Germany, which is…

1 hour ago

Which River is Known as the Lifeline of Northeast India?

Northeast India is a region full of beautiful landscapes, green forests and rich culture. A…

1 hour ago

Which is the Largest Railway Station of Jharkhand? Know About It

Jharkhand, a state in eastern India, has a well-developed railway network that connects it to…

1 hour ago

Which is the Largest Railway Station of Haryana? Know About It

Haryana is a well-developed state with a strong railway network that connects many important cities.…

1 hour ago