US plans to set up a Nuclear Reactor on Moon

USA’s plan to set up the first nuclear reactor on the moon by the end of 2026. In early 2021, the US Department of Energy in collaboration with NASA intends to solicit industry design proposals. It also got an impetus with a recent White House directive.

The outgoing President Donald Trump, issued the “National Strategy for Space Nuclear Power and Propulsion” on 16 December.

Under it, he asked Nasa to “initiate fission surface power project for lunar surface demonstration by 2027 with scalability to a power range of 40 kilowatt-electric and higher to support a sustained lunar presence and exploration of Mars”.

The objective of NASA behind this was to establish a flight hardware system that is ready for integrating with the lunar lander by 2026 end. The nuclear reactor is known as the fission power system that will benefit future robotic and human expedition missions to the moon as well as Mars.

The availability of safe, efficient, and readily available power is critical to these missions and a fission surface power system meets those requirements.

The fission surface power system will be fully manufactured and assembled on earth and integrated on a lander as a payload.

The system consists of four major subsystems including a nuclear reactor which is an electric power conversion unit, heat rejection array, and power management and distribution subsystem and will be designed to operate for up to 10 years.

Important takeaways

– Nuclear reactors are the heart of a nuclear power plant. The main work of a reactor is to house and control nuclear fission which is a process where atoms split and release energy.

– They contain and control nuclear chain reactions that produce heat through a physical process called fission. That heat is used to generate steam that spins a turbine to create electricity.

Also, all the commercial reactors in the United States are light-water reactors. That is they use normal water as both a coolant and neutron moderator.

 

 

 

 

 

 

Mahesh Kumar

Working as an SEO Manager at Adda247, I bring over 10 years of experience in Search Engine Optimization (SEO) and digital marketing. I specialize in driving organic growth through data-driven strategies, including keyword research, on-page SEO, off-page optimization, and technical SEO. My area of expertise in the EdTech sector, specifically focusing on competitive exams such as Bank, SSC, Railway, UPSC, and various State Government job examinations.

Recent Posts

Punjab Launches SANGAT Mental Health Clubs in 40 Colleges

The Punjab government reportedly launched SANGAT Mental Health Clubs in 40 colleges on 22 October…

2 hours ago

Nitesh Kumar and Naveen Sivakumar Win Para-Badminton Gold

Indian para-badminton players Nitesh Kumar and Naveen Sivakumar reportedly won men’s singles gold medals at…

2 hours ago

Greece Approves Social Media Ban for Children Under 15

Greece’s Parliament reportedly approved legislation on 23 October 2026 to prohibit children under 15 from…

3 hours ago

Kochi Student Wins 28th Charles Correa Gold Medal 2026

A Kochi-based architecture student won the 28th Charles Correa Gold Medal in Mumbai on October…

3 hours ago

Ameena Nazreen A S Receives US$500 Award at Global Youth Institute 2026

Ameena Nazreen A S received a US$500 cash award at the Global Youth Institute on…

3 hours ago

Yashaswini Ghorpade and Harmeet Desai Secure Medal at Asian Table Tennis Championships 2026

Indian table tennis players Yashaswini Ghorpade and Harmeet Desai secured a medal in mixed doubles…

3 hours ago