Categories: Business

Adani New Industries installed India’s largest wind turbine

India’s largest wind turbine by Adani: Adani New Industries Ltd. has constructed a wind turbine in Mundra in Gujarat as part of its growth plans for renewable energy that is taller than the Statue of Unity and has blades that are broader than the wingspan of a jumbo jet.

Buy Prime Test Series for all Banking, SSC, Insurance & other exams

India’s largest wind turbine by Adani: Key Points

  • Adani New Industries Limited (ANIL) announced the installation of the largest wind turbine generator (WTG) in the nation in Mundra, Gujarat.
  • Mundra Windtech Ltd (MWL), an Adani Enterprises Ltd. wholly-owned company, installed the turbine.
  • This prototype is also Adani New Industries Ltd.’s (ANIL) first addition to its portfolio and has paved the way for the installation of even larger wind turbine generators, according to the company.
  • A record-breaking 19 days were needed to finish the proto assembly. It has been set up and tested, and will soon apply for a type certification.

About the wind turbine:

  • The wind turbine, which is 200 metres tall and can power over 4,000 households with 5.2 MW of electricity, can generate.
  • The Statue of Unity, which stands at 182 metres, is the tallest statue in the world, it was added.
  • It is the longest in the nation, with blades that are longer than a jumbo jet’s wingspan, at 78 metres.
  • Its 160-meter-diameter rotor makes it the most powerful wind turbine in the world. The wind turbine generator’s hub height is 120 metres, or roughly the height of a 40-story structure.
  • The popularity of wind turbines has increased dramatically over the past few years.
  • Turbines of a capacity of 4 MW or more are typically installed offshore, where the machines can reach 14 MW in size.
  • However, a 5.2 MW onshore turbine is extremely uncommon and is almost never found in India.
  • It was also said that this machine is a first and was constructed using German company W2E (Wind to Energy) technology.
  • It can operate at wind speeds as low as 3 mps and as high as 20 mps, with 12 mps or so being the wind speed at which it produces the most electricity.
  • India’s single wind turbine’s maximum capacity was 2-3 MW only a few years ago.

Important Takeaways for All Competitive Exams:

  • Gujarat Chief Minister: Bhupendra Bhai Patel
  • MWL’s Chief Operating Officer (COO): Milind Kulkarni

Find More Business Here

 

Madhavi Gaur

Recent Posts

Eminent Personalities Honoured with Prestigious Pandit Lacchu Maharaj Award

Noted Hindi film superstars Hema Malini and Saira Banu, along with other prominent personalities from…

4 mins ago

Alok Shukla Wins Prestigious Goldman Environmental Prize 2024

Alok Shukla, a renowned environmental activist and convenor of Chhattisgarh Bachao Andolan, has been selected…

4 mins ago

Deloitte India’s Economic Outlook: FY24 and FY25 GDP Growth Predictions

Deloitte India has revised its GDP growth forecasts for FY24 and FY25, with a significant…

45 mins ago

India’s Ecommerce Market Set to Become Third Largest Globally by 2030

Invest India predicts that India's ecommerce sector will skyrocket to $325 billion by 2030, with…

59 mins ago

Who was the First Chief Minister of Uttarakhand?

Uttarakhand, nestled in the foothills of the Himalayas, holds a special place in India's landscape,…

1 hour ago

Dubai Breaks Ground on ‘World’s Largest’ Airport Project

Dubai is embarking on an ambitious endeavor to construct the world's largest airport, Al Maktoum…

2 hours ago