Categories: Miscellaneous

Maruti Suzuki installed Asia’s largest 20 MWp solar plant at Manesar

Maruti Suzuki India has installed a 20 MW solar carport at its Manesar, Haryana, site. The project is projected to provide the organisation with 28,000 MWh of electricity per year. According to the firm, the energy generated by this initiative will be similar to the energy required to create nearly 67,000 cars every year. This is Asia’s largest solar carport, according to the business.

Buy Prime Test Series for all Banking, SSC, Insurance & other exams

KEY POINTS:

  • Using the East-West orientation approach, the solar carport is constructed with the smallest area per unit of electricity generation.
  • The East-West approach allows developers to add more rows and panels, increasing generation capacity while using less space.
  • Approximately 9,000 finished vehicles can be parked at the site.
  • Companies are focused on making the most of available space in order to save money on energy and meet sustainability goals.
  • Solar carports are an excellent way to turn an otherwise unused space into a source of renewable energy.
  • Carports have the added benefit of providing covered parking spots in addition to generating solar energy.
  • They are more visible than traditional rooftop solar panels and assist businesses in incorporating climate mitigation.

Maruti Suzuki Projects:

  • Maruti Suzuki launched a 5 MW solar carport at its Gurugram site in 2020.
  • The project was designed to meet the facility’s internal energy needs and was timed to coincide with a captive power project.
  • The company’s total solar power capacity throughout its plants presently stands at 26.3 MW, including the 1.3 MW solar plant installed in 2014.

The commercial and industrial sectors have witnessed a significant increase in demand for solar to meet their energy needs at lower costs while also achieving their sustainability goals. Through an offshore corporate power purchase agreement, Suzuki Motor Gujarat, a Suzuki subsidiary, began purchasing power from a 17.6 MW hybrid wind and solar power project erected by ReNew Power in June 2022.

Suzuki Motor Corporation, the parent firm of Maruti Suzuki India, inked a memorandum of understanding with Gujarat in March this year, agreeing to invest around 150 billion yen ($1.13 billion) in local manufacturing of battery electric vehicles (BEVs) and BEV batteries.

Recent Posts

Weekly Current Affairs One Liners (09th to 15th of March 2026)

Weekly Current Affairs One-Liners Current Affairs 2026 plays a very important role in competitive examinations…

45 mins ago

Health Ministry Grants Lifetime Validity to FSSAI Licences, Ends Dual Licensing for Street Food Vendors

In a major reform aimed at improving the ease of doing business in India, the…

16 hours ago

José Antonio Kast Rist Takes Oath as the President of Chile

José Antonio Kast has officially taken office as the new President of Chile, marking a…

16 hours ago

Government Launched National Initiative “Bal Vivah Mukt Bharat” to End Child Marriage

Child marriage is a serious social issue in India, affecting the rights, health, and education…

18 hours ago

PM Narendra Modi Launches ₹526 Crore Assam Waterways Projects, Dedicates Elevated Port Corridor in Guwahati

Prime Minister Narendra Modi recently dedicated a modern elevated road corridor connecting Pandu Port to…

18 hours ago

Union Jal Shakti Minister Introduces Sujal Gaon ID for Digital Mapping of Rural Water Supply Schemes

The Union Ministry of Jal Shakti is taking big steps under Jal Jeevan Mission (JJM)…

19 hours ago