Union Railway Minister Piyush Goyal inaugurated the first phase of “East-West Metro line” which is Kolkata’s second metro line. The phase 1 of the East-West Metro corridor is a 5.3 kms long stretch with 6 elevated stations and executed by Kolkata Metro Rail Corporation Limited (KMRCL).
Overall, the East-West Metro corridor of the Kolkata is a 16.5 kms long stretch. The East-West Metro corridor connects the Howrah on the West bank of River Hooghly with Salt Lake city on the East bank.
Key Feature of the East-West Metro corridor:
The East-West Metro corridor is the first ever transportation project of India where metro trains will ply under river “Hooghly”. It will come with Communication Based Train Control System (CBTC) supported with enhanced safety features like automatic train control mechanism and anti-collision.
The East-West Metro corridor is the second metro line of Kolkata. The presently running Metro services in Kolkata operate on only North-South corridor. This corridor is a 27.3 Km long stretch from Noapara to Kavi Subhas station. The North-South corridor was inaugurated in 1984.
Important takeaways for all competitive exams:
From the sprawling plains of the Midwest to the sun-kissed shores of the Pacific, the…
The Indian political landscape has lost a seasoned leader with the passing of V. Srinivas…
The Badminton World Federation (BWF) has announced that India will host the prestigious 2025 BWF…
In the mosaic of American cities, certain urban centers stand out as bastions of liberal…
In a remarkable achievement, ICICI Bank has etched its name among India's top five companies…
The Government of India has introduced a Floating Rate Bond (FRB) maturing in 2034, with…