The Army inducted the first production lot of 12 Short Span Bridging System (SSBS)-10m, designed and developed by the Defence Research and Development Organisation (DRDO) in association with Larsen & Toubro Limited, the production agency. The SSBS-10m plays a crucial role of bridging the gaps up to 9.5m as a single span providing a 4m wide, fully decked roadway, ensuring faster movement of the troops.
Buy Prime Test Series for all Banking, SSC, Insurance & other exams
About the SSBS-10m:
- The project involved the development of two prototypes of 5m SSBS on Tatra 6×6 chassis and another two prototypes of 10m SSBS on Tatra 8×8 re-engineered chassis.
- This bridging system is compatible with the Sarvatra bridging system (75 m), where the last span required covering gaps less than 9.5 m.
- The DRDO has developed a range of bridges for the Army that have already been inducted.
Important takeaways for all competitive exams:
- Chairman DRDO: Dr G Satheesh Reddy.
- DRDO Headquarters: New Delhi.
- DRDO Established: 1958.