To boost connectivity and agricultural irrigation in Bihar, the Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi has approved two key infrastructure projects—the Patna-Arrah-Sasaram Corridor and the Kosi-Mechi Intra-State Link Project. These projects aim to support regional development, generate employment, and align with the government’s vision of “Atmanirbhar Bharat.”
Key Highlights
Patna-Arrah-Sasaram Corridor (NH-119A)
- Type: 4-lane access-controlled corridor (Hybrid Annuity Mode – HAM).
- Length: 120.10 km.
- Cost: ₹3,712.40 crore.
Purpose
- Decongest existing state highways.
- Reduce travel time from 3–4 hours.
Connectivity Benefits
- Links Patna to Sasaram and Arrah.
- Connects with major transport nodes including the upcoming Bihita Airport and railway stations.
- Enhances linkage between cities like Patna, Varanasi, Ranchi, and Lucknow.
- Employment Generation: Around 48 lakh man-days.
- Socio-economic Impact: Boosts regional growth and logistics efficiency.
Kosi-Mechi Intra-State Link Project
- Inclusion: Under PMKSY-AIBP (Pradhan Mantri Krishi Sinchai Yojana – Accelerated Irrigation Benefits Programme).
- Estimated Cost: ₹6,282.32 crore.
- Central Assistance: ₹3,652.56 crore.
- Completion Target: March 2029.
Objective
- Divert surplus water from the Kosi River to irrigate the Mahananda basin.
- Remodel the Eastern Kosi Main Canal (EKMC).
Irrigation Impact
- Additional irrigation potential for 2.10 lakh hectares.
- Covers Araria, Purnea, Kishanganj, and Katihar districts.
- Benefits Kharif crop irrigation.
- Agricultural Growth: Ensures water access for current and new farmlands.
Summary/Static | Details |
Why in the news? | Cabinet Approves Patna-Arrah-Sasaram Corridor & Kosi-Mechi Intra-State Link Project |
Patna-Arrah-Sasaram Corridor | – 120.10 km, 4-lane – ₹3,712.40 crore – HAM model – Reduces travel time, decongests state highways – Links Patna, Sasaram, Bihita Airport, major cities – Employment: 48 lakh man-days |
Kosi-Mechi Intra-State Link Project | – ₹6,282.32 crore total cost – ₹3,652.56 crore central support – Completion by March 2029 – Irrigates 2.10 lakh hectares in 4 districts – Part of PMKSY-AIBP – Remodels EKMC, benefits Kharif season irrigation |