The Indian Navy has launched its second Project 1135.6 follow-on frigate, ‘Tavasya’, at Goa Shipyard Limited (GSL). The warship is designed for multi-role combat operations across air, surface, and sub-surface domains. This marks a significant step in India’s self-reliance in warship construction under the Atmanirbhar Bharat initiative.
Key Highlights
Launch & Specifications
- ‘Tavasya’ launched at Goa Shipyard Limited (GSL).
- Measures 124.8m in length, 15.2m in width, and 4.5m draught.
- Speed: Can reach up to 28 knots.
- Displacement: Over 3,800 tonnes.
Combat Capabilities
- Engineered for surface, sub-surface, and air warfare.
- Equipped with stealth technology, advanced weapons, sensors, and platform management systems.
- Incorporates indigenous weapons such as the BrahMos missile system, torpedo launchers, sonar, and auxiliary control systems.
Project 1135.6 & Indo-Russian Collaboration
- India and Russia signed a 2016 agreement for four additional stealth frigates.
- Two ships were to be built in Russia, and two at GSL under technology transfer.
- ‘Tavasya’ is the final vessel in this series and the second constructed at GSL.
- The first vessel, ‘Triput’, was launched on July 23, 2024.
Strategic Significance
- Advances India’s self-reliance in defence manufacturing.
- Aligns with Rs 500 billion ($5.85 billion) defence export goal by 2029.
- Strengthens India’s shipbuilding ecosystem and naval power.
Statements from Leaders
- State Defence Minister Sanjay Seth emphasized India’s technological advancements and the launch’s role in strengthening strategic defence ambitions.
- GSL CMD Brajesh Kumar Upadhyay highlighted GSL’s growth from a mid-sized shipbuilder to a premier defence shipyard.
Past Developments
- INS Tushil, the first of two additional upgraded Talwar-class frigates, was commissioned in December 2024 in Russia.
- Six ships from Project 1135.6 are already in service, including three Talwar-class and three Teg-class frigates.
Summary/Static | Details |
Why in the news? | Indian Navy Launches Frigate ‘Tavasya’ Under Project 1135.6 |
Frigate Name | Tavasya |
Project | 1135.6 Follow-On Frigate |
Launch Date | March 24, 2025 |
Location | Goa Shipyard Limited (GSL) |
Dimensions | 124.8m (length), 15.2m (width), 4.5m (draught) |
Speed | 28 knots |
Displacement | 3,800+ tonnes |
Combat Capabilities | Surface, sub-surface, air warfare |
Stealth & Indigenous Tech | BrahMos, sonar, torpedo launchers |
First Follow-On Frigate | Triput (launched July 23, 2024) |
Defence Export Target | Rs 500 billion ($5.85 billion) by 2029 |
Indo-Russian Collaboration | Tech transfer for domestic warship construction |