The Ministry of Coal has launched the Mine Opening Permission module on the Single Window Clearance System (SWCS) portal, enhancing the approval process for opening coal mines. Inaugurated by Secretary Vikram Dev Dutt on November 7, 2024, this digital initiative aligns with Prime Minister Narendra Modi’s vision of a “Viksit Bharat” and a digitally enabled economy. The module aims to simplify and expedite the clearance process, supporting India’s energy security and self-reliance goals. By reducing manual paperwork, it fosters an investment-friendly environment and aims to increase coal production.
Key Features of the New Module
Digital Transformation: The Mine Opening Permission module facilitates online applications and real-time tracking, reducing paperwork and processing time.
Increased Transparency: The system enhances efficiency and transparency, contributing to a more streamlined approval process.
Boosting Investment: By simplifying the clearance process, the module encourages investment and faster approvals in the coal sector.
Significance in India’s Energy Sector
Strengthening Energy Security: This initiative supports faster coal mine openings, contributing to enhanced coal production and energy security.
Supporting Sustainability: The move aligns with the nation’s vision of sustainable development by enabling quicker mine operationalization while ensuring environmental standards.
Linking the Past and Present
The launch of this module marks a continuation of the government’s commitment to modernizing the coal sector. Since the launch of the SWCS in January 2021, digital solutions have been playing a critical role in enhancing the ease of doing business in the coal industry. This new module builds on that momentum, aiming for accelerated growth in coal production, contributing to India’s overall energy goals.
SWCS (Single Window Clearance System) Portal
Launch Date: January 11, 2021.
Objective: Simplifies the process of obtaining all necessary clearances and approvals required to operationalize coal mines.
Key Feature: Provides a unified platform for applications related to coal mining projects.
Mine Opening Permission Module: Introduced on November 7, 2024, to accelerate and streamline the approval process for opening coal mines.
Digital Solutions: Reduces manual paperwork, improves transparency, and enhances efficiency.
Real-Time Tracking: Allows applicants to track the status of their applications.
Investment-Friendly: Aims to create a more conducive environment for faster approvals and increased coal sector investment.
Summery of the News
Why in News | Key Points |
---|---|
Ministry of Coal launches Mine Opening Permission module on SWCS portal | – Date of Launch: November 7, 2024 – Objective: Simplify approval for opening coal mines – SWCS portal: Launched on January 11, 2021 – Key Features: Online application, real-time tracking, enhanced transparency |
POWERGRID and Transmission Infrastructure | – Transmission Infrastructure: 418,000 ckt km, projected to grow by 200,000 ckt km by 2030 – National Transformation Capacity: 1,225,000 MVA, POWERGRID contributes 50% – Substations: 280 substations, with plans for expansion by 2030 |
Technological Advancements in Power Sector | – AI & ML: Used for maintenance and operational efficiency – Smart Transmission Lines: Based on dynamic line rating systems – Drones: Used for patrolling transmission towers – SF6-Free Switchgear: Shift towards environment-friendly technology |
Green Energy and Sustainability | – Goal: Achieve net-zero carbon emissions by 2047 – Shift: Towards green technologies and sustainable transmission infrastructure |
Coal Sector Developments | – Digital Solutions: Improve ease of doing business – Investment-Friendly: Supports faster approvals for coal mine operationalization – Self-Reliance: Aimed at strengthening India’s energy security |
Key Figures | – Secretary, Ministry of Coal: Shri Vikram Dev Dutt – Director (Operations), POWERGRID: Naveen Srivastava |