The Z-Morh tunnel, set to be inaugurated by Prime Minister Narendra Modi on January 13, 2024, marks a significant step in creating a year-round strategic corridor between Kashmir and Ladakh. The tunnel is critical for ensuring continuous access to Sonamarg, a popular tourist destination, which was previously inaccessible during the winter months due to snow and avalanches. Built under the Thajiwas Glacier, it bypasses landslide-prone areas and includes an intelligent traffic management system to enhance safety and control vehicle flow. The tunnel is also expected to boost winter tourism in Kashmir and support military logistics to Ladakh.
Key Highlights
Details
- Tunnel Inauguration: PM Modi is set to inaugurate the Z-Morh tunnel on January 13, 2024.
- Strategic Importance: Facilitates a year-round access route to Ladakh, crucial for security and tourism.
- Tourism Boost: Opens up Sonamarg for winter tourism, which was previously inaccessible due to harsh winter conditions.
- Location: The tunnel is located between Gagangir and Sonamarg in Ganderbal district, under the Thajiwas Glacier.
- Cost and Size: Built at ₹2,680 crore, the 6.5 km tunnel is a vital part of the Kashmir-Ladakh corridor.
- Security Enhancements: Additional security measures have been implemented across Kashmir, especially ahead of the inauguration.
- Impact on Local Economy: Will increase footfall and business for hoteliers in Sonamarg during the winter.
- Future Projects: The Z-Morh tunnel will link to the Zojila tunnel, which, when completed, will be Asia’s longest tunnel.
Tunnel Features
- Construction: Bypasses landslide-prone areas with an intelligent traffic management system.
- Dimensions: The main tunnel is 10.8 meters wide, with an escape tunnel of 7.5 meters, and ventilation tunnels of 8.3 meters.
- Purpose: Enhances access to Ladakh, ensures safe winter access to Sonamarg, and reduces travel risks.
Zojila Tunnel Connection
- Zojila Tunnel: Will be Asia’s longest tunnel, improving travel between Ganderbal (Kashmir) and Kargil (Ladakh).
- Travel Time: Reduces travel time from 3 hours to just 20 minutes.
- Future Development: Built at ₹6,800 crore, the Zojila tunnel will provide reliable access to Ladakh during winter, which is currently cut off for months due to snow.
- Military Importance: Critical for the movement of goods and security forces to Ladakh.
Summary/Static | Details |
Why in the news? | PM to Inaugurate Z-Morh Tunnel, Boosting Kashmir-Ladakh Connectivity |
Inauguration Date | January 13, 2024 |
Location | Ganderbal district, Kashmir, under Thajiwas Glacier |
Tunnel Length | 6.5 km |
Cost | ₹2,680 crore |
Strategic Importance | Year-round access to Ladakh and enhanced security logistics |
Tourism Impact | Boosts winter tourism, especially in Sonamarg |
Security | Enhanced security measures for PM’s visit |
Traffic Management | Intelligent traffic system for vehicle flow |
Zojila Tunnel | Will link to Z-Morh tunnel, reducing travel time to Ladakh |
Zojila Tunnel Length | 13.14 km, expected to be Asia’s longest |
Economic Benefits | Increase in business for hoteliers, boost to winter tourism |