Home   »   Semi Conductor Projects in UP

UP Cabinet Clears ₹3,706 Cr HCL-Foxconn Semiconductor Project

The Uttar Pradesh Cabinet has approved a major semiconductor manufacturing project led by Vama Sundri Investment, a subsidiary of HCL Tech, in partnership with Foxconn. This ambitious facility, to be set up along the Yamuna Expressway, involves an investment of ₹3,706 crore and aims to strengthen India’s semiconductor production capabilities.

Key Details of the Semiconductor Projects

Project Approval

  • The UP Cabinet has approved projects by Vamasundari (HCL Group) and Tarq Semiconductor (Hiranandani Group), aiming to establish a semiconductor manufacturing hub in Jewar, near the Noida International Airport.

Investment and Location

HCL Group’s Vamasundari Investment

  • Investment: ₹3,706 crore.
  • Location: Sector 10 near Noida International Airport along the Yamuna Expressway.

Hiranandani Group’s Tarq Semiconductor

  • Investment: ₹28,440 crore.
  • Location: Sector 28 near the airport along the Yamuna Expressway.

Production Plans

  • The HCL Group’s facility will focus on producing small panel driver ICs and display driver integrated circuits (DDIC) with a projected annual output of 240,000 units.

Employment Potential

  • Direct Employment: 1,000 jobs.
  • Indirect Employment: 10,000 jobs.

Additional employment opportunities estimated at 3,780 positions for the HCL Group’s project.

Joint Venture Details

  • Vamasundari Investments (HCL Group) will collaborate with Foxconn Hon Hai Technology India Mega Development for an OSAT (Outsourced Semiconductor Assembly and Test) facility.

Ownership Structure

  • Vamasundari Investments (HCL) holds 60% equity, while Foxconn holds 40%.

Land Allotment and Facilities

  • The Yamuna Expressway Industrial Development Authority (YEIDA) has issued a ‘letter of intent’ for land allocation to Vamasundari Investments.

Total Land Area: 50 acres.

Infrastructure Requirements

  • 9,000 KVA of electricity and 2,000 MLD of water per day (85% water recycling efficiency planned).

Government Subsidies and Support

  • Additional Incentives: Further financial incentives will be offered upon commencement of production.
  • These state incentives supplement central government support under the India Semiconductor Mission (ISM) scheme.

Timeline and Future Steps

  • Tarq Semiconductor’s application under the ISM scheme is pending final approval from the central government.
  • Expected Timeline: If approval is received by December, construction may commence by April, with a target to start operations within 18 months after work begins on-site.

Impact on Indian Semiconductor Ecosystem

  • The projects are expected to reduce import dependence by bolstering domestic semiconductor manufacturing capabilities.
  • Strategic Location: Proximity to Noida International Airport will enhance logistical advantages for exports and imports.
  • Boost to Self-Reliance: Supports India’s goal of technological self-reliance in electronics and semiconductor sectors, enhancing India’s position in the global supply chain.
Summary/Static Details
Why in the news? UP Cabinet Clears ₹3,706 Cr HCL-Foxconn Semiconductor Project and Tarq Semiconductor (Hiranandani Group)
Project Approval UP Cabinet 
Investing Companies
  1. Vamasundari Investments (HCL Group) with Foxconn collaboration.
  2. Tarq Semiconductor (Hiranandani Group).
Investment
  • Vamasundari (HCL Group): ₹3,706 crore.
  • Tarq Semiconductor: ₹28,440 crore.
Strategic Impact
  • Strengthens India’s semiconductor ecosystem.
  • Reduces import dependency.
  • Boosts UP’s high-tech industry infrastructure.
Chairman or MCD Foxconn – Young Liu

Hiranandani Group – Niranjan Hiranandani 

HCL – Roshni Nadar Malhotra

UP Cabinet Clears ₹3,706 Cr HCL-Foxconn Semiconductor Project_4.1

UP Cabinet Clears ₹3,706 Cr HCL-Foxconn Semiconductor Project_5.1

TOPICS: