In March 2023, the railway network in the state of Haryana in India was completely electrified by Indian Railways, making it the first state in the country to achieve 100% electrification of its railway network.
Buy Prime Test Series for all Banking, SSC, Insurance & other exams
Haryana: 100% Electrified Railway Network:
- The existing Broad Gauge network of Haryana is 1,701 Route kilometre, which is now 100% electrified, resulting in saving on account of reduced line haul cost (about 2.5 times lower), heavier haulage capacity, increased sectional capacity, reduced operating & maintenance cost of electric loco, energy efficient and eco-friendly mode of transportation with reduced dependence on imported crude oil, saving of foreign exchange.
- Further, new Broad Gauge network shall be sanctioned along with electrification, in sync with Railways’ policy of 100% electrified network.
Indian Railways: 100% electrification of its broad-gauge routes by December 2023:
As per the latest updates, the Broad Gauge routes of seven zonal railways in India have achieved the 100% electrification target.
These railways are East Coast Railway (ECoR), North Central Railway (NCR), North Eastern Railway (NER), Eastern Railway (ER), South Eastern Railway (SER), West Central Railway (WCR), and Central Railway (CR).
This achievement is a significant step towards reducing greenhouse gas emissions and promoting sustainable transportation in the country.
The Indian Railways has set a target to achieve 100% electrification of its broad-gauge routes by December 2023, and this milestone achieved by these seven zonal railways is a significant step towards achieving this goal.