On 25th November 2026 the Cabinet Committee on Economic Affairs, headed by the Prime Minister Narendra Modi, gave approval for a Second Container Terminal to be set up at Kamarajar Port Limited in Tamil Nadu. The scheme is to be delivered in a Public-Private Partnership (PPP) format and follows a Design, Build, Finance, Operate and Transfer (DBFOT) model. It has an approximate total cost (including GST) of ₹4,288.26 crore and will increase the port’s annual container throughput by 2 million TEUs.
Kamarajar Port Second Container Terminal
- Project – Second Container Terminal
- Port – Kamarajar Port Limited
- State – Tamil Nadu
- Approving body – Cabinet Committee on Economic Affairs
- CCEA Head – Prime Minister Narendra Modi
- Approximate cost – ₹4,288.26 crore (including GST)
- Delivery model – Public Private Partnership (PPP)
- Project model – Design, Build, Finance, Operate and Transfer (DBFOT)
- Length – 900m
- Throughput – 2 million TEUs
- Draft depth – 18 metres
- Duration of concession – 40 years
- Construction time frame – 48 months
- Dredging cost – ₹450 crore (to be met by KPL)
Features of Kamarajar Port’s Second Container Terminal
The new terminal will further enhance Kamarajar Port’s ability to manage increasing container volumes and enable it to handle bigger containerships.
It has the following key attributes,
- Length – 900m.
- Width of berth – 30m.
- Draft depth – 18m.
- Throughput – 2 million TEUs.
- Ship throughput – Ships with a capacity of up to 24,346 TEUs.
- Maximum ship length – 400m.
It is suited for large container ships and is therefore likely to boost Kamarajar Port’s linkages with international shipping.
Phases of the Development
The Second Container Terminal will be constructed in two phases and have an aggregate throughput of 2 million TEUs.
| Aspect | Phase I | Phase II |
| Throughput | 1.1 million TEUs | 0.9 million TEUs |
| Cost | ₹2,429.32 crore | ₹1,858.94 crore |
| Construction time frame | First 24 months | 25th-48th month |
| Commencement of commercial operation | 25th month | 49th month |
Phase I of the scheme is to be completed within 24 months of the Date of Award of Concession. Phase II is to be completed by the 48th month. Commercial operation may then begin from the 49th month.
Project Delivery and Funding
The project will be delivered by a successful private sector concessionaire in Public Private Partnership (PPP) mode based on a DBFOT model.
The concessionaire will fund the scheme which has an approximate cost of ₹4,288.26 crore. In addition, Kamarajar Port Limited is to fund the approximate dredging cost of ₹450 crore.
The concessionaire will recoup its investment via fees as specified in the Concession Agreement and relevant tariff regime.
Important aspects of delivery are,
A concession duration of 40 years (of which 48 months is for construction).
An open worldwide competitive tender process for concessionaire appointment.
Private sector concessionaire funding.
Prompt achievement of environmental and other required approvals prior to the tender deadline.
No Government of India funding for the PPP aspect.
Why is a Second Container Terminal Needed?
Kamarajar Port is experiencing increasing container throughput as southern India’s industrial and manufacturing activity expands.
As stated in the Cabinet notification,
- KPL cargo throughput in FY 2025-26: 49.08 million tonnes
- Number of vessels in FY 2025-26: 1,008
- Containers throughput in FY 2025-26: Over 7 lakh TEUs
- Present container terminal throughput: 0.8 million TEUs per year
- Current terminal utilisation rate: ~88%
- India’s 5-year average annual rate of container throughput growth: ~7%
- KPL’s 5-year average annual rate of container throughput growth: ~9.9%
- KPL’s 5-year average annual rate of cargo throughput growth: 13.64%
Economic and Strategic Significance
The scheme is anticipated to bolster maritime logistics and promote industrial growth in Tamil Nadu and beyond in the southern states.
Enhanced Global Linkages
- It is anticipated that the terminal’s 18 metre draft depth and ability to manage large ships will allow mainline container ships to make direct visits to Kamarajar Port.
- This would decrease reliance on overseas deep sea gateway ports and thus help to cut feedering expenses.
Facilitating Industry and EXIM
The project will back the containerised outputs of key industries such as,
- Automotive and automotive supply.
- Engineering.
- Electronics.
- Chemicals.
- And other industry sectors.
It will back industrial areas in Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and neighbouring states.
Job Creation
- It is expected that the scheme will create jobs for around:
- 750 people (directly and indirectly) during the construction period.
- 800 people during the operational period.
Boosting Maritime Strength
- Extra terminal throughput is expected to further optimise maritime logistics. It will also underpin industry and commerce and is likely to boost Kamarajar Port’s income.
- The scheme is consistent with both the Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047 strategies.
Background information about Kamarajar Port Limited
Kamarajar Port Limited (formerly called Ennore Port Limited) is one of India’s 12 major ports. It is fully owned by the Chennai Port Authority and falls under the administrative control of the Ministry of Ports, Shipping and Waterways.
Situated on the eastern coastline of Tamil Nadu close to the Chennai industrial and economic area, the port manages a variety of cargo types.
- Current name: Kamarajar Port Limited
- Previous name: Ennore Port Limited
- State: Tamil Nadu
- Country: India (eastern coastline)
- Owner: Chennai Port Authority
- Controlling ministry: Ministry of Ports, Shipping and Waterways
- Port classification: Major Port
- FY 2025-26 turnover: Approximately ₹1,280 crore
- FY 2025-26 Profit Before Tax: ₹924 crore








Cabinet Approves ₹2,014 Crore Greenfie...
Wayanad Becomes India’s First E-Waste-...
West Bengal New Name Paschim Banga: 2026...

